Search Details
Projects involving U.S. 1
Interstate 95 from south of Greenland to Butler Boulevard
2009/2010 - 2011/2012
Rehabilitate 8.6 miles of concrete pavement on Interstate 95 from south of Greenland to J. Turner Butler Boulevard (State Road 202) in 2009/10 at estimated $36.8 million. Nelson Bedenbaugh/project designer. (2132175)
State Road 9B from SR 9A to US 1 (Philips Highway)
Summer 2010 - Summer 2012
Phase one of State Road 9B begins at State Road 9A and extends approximately three miles to U.S. 1.
State Road 9B from U.S. 1 to Interstate 95
Unfunded - Unknown
State Road 9B is proposed to extend from U.S. 1 to Interstate 95 during phase two.
Baymeadows Road (State Road 152) Traffic Signal Updates
February 2010 - Fall 2010
Updating traffic signals from U.S. 1 (Philips Highway) to State Road 115 (Southside Boulevard).
News Kings Road (U.S. 1) Sidewalk Addition from Hema Road to Richardson Road
May 2010 - Late Summer 2010
Building 5-foot concrete sidewalk from Hema Road to Richardson Road (.2 mile).
Alerts involving U.S. 1
U.S. 1 south of Race Track Road (Nocatee Flyover Project)
September 11 - September 17, 2010:
Daytime lane closures for southbound traffic Monday, Sept. 13 through Thursday, Sept. 16 for milling and paving. ...
Hart Bridge Ramps at the Sports Complex Routine Sign Maintenace
September 11 - September 17, 2010:
Lanes on various ramps will be closed on Wednesday, September 15 from 9:30 a.m. to 4 p.m. for routine sign maintenance. ...
Back to Project Listings