Search Details

Projects involving State Road 9A

State Road 9A Landscape at Butler Blvd Interchange
2010/2011 - 2011/2012
Landscaping State Road 9A at the Butler Boulevard Interchange (State Road 202) in 2010/2011. Jessee Manalo is FDOT Project Designer. (2092783)

State Road 9A from Main Street to New Berlin Road
September 2009 - Spring 2010
Resurface State Road 9A from Main Street to New Berlin Road. (2133463)

State Road 9A from Monument to I-95 North ITS
2010/2011 - July 2012
Install Intelligent Transportation System (ITS) from Monument to I-95 North at an estimated $7.8 million. (2132383, 2132385).

State Road 9B from SR 9A to US 1 (Philips Highway)
Summer 2010 - Summer 2012
Phase one of State Road 9B begins at State Road 9A and extends approximately three miles to U.S. 1.

Alta Drive/New Berlin Road Resurfacing from New Berlin Road to State Road 9A
March 2010 - Late Fall 2010
Resurfacing and paving shoulders on Alta Drive from New Berlin Road to State Road 9A and on New Berlin Road from Zoo Parkway to Alta Drive (1.5 miles).

Alta Drive/New Berlin Road Resurfacing
December 2010 - Fall 2010
Resurfacing and paving shoulders on Alta Drive from New Berlin Road to State Road 9A and on New Berlin Road from Zoo Parkway to Alta Drive (1.5 miles).

Alerts involving State Road 9A

Dames Point Bridge Routine Bridge Maintenance
September 4 - September 10, 2010: Single lanes in both directions will be closed on Thursday, September 9 from 10 a.m. to 3 p.m. for routine bridge maintenance....

Back to Project Listings