Projects
Sort Projects By: County | City | Road
Alachua
Main Street (State Road 329)
In June 2000, the Metropolitan Transportation Planning Organization (MTPO) amended their Long Range Plan to include the Main Street reconstruction project, reducing Main Street from four lanes to two lanes with a center turn lane between Depot Avenue and NW 8th Avenue. Construction of this project began September 8th and is expected to take about two years to complete.
U.S. 27 (S.R. 500) in Williston Railroad Crossing Repairs
The railroad crossing on State Road (S.R.) 500/U.S. 27 just west of Southeast Eighth Street in Williston is scheduled to be replaced and will close the road for two days next week, according to Florida Department of Transportation.
Baker
Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.
U.S. 90 Road Improvements
Work is expected to begin this week on a $5.5 million project to resurface and improve U.S. 90 in Baker County, according to the Florida Department of Transportation.
State Road 228 / South Fifth Street Railroad Crossing Repairs
State Road (S.R.) 228/South Fifth Street at the railroad crossing just south of Macclenny Avenue (U.S. 90) in Macclenny is scheduled to be closed to all traffic from August 2-13 for replacement of the railroad crossing, according to the Florida Department of Transportation.
Bradford
State Road 100 Resurfacing
Improvements to State Road 100 in Bradford County between the Clay County line and County Road 100A, just east of Starke, began in early December, according to Florida Department of Transportation (FDOT).
Clay
Knight Boxx Road (County Road 220B) Resurfacing
Duval Asphalt will be on-site Monday (April 19) to start milling and resurfacing Knight Boxx Road (CR 220B) between Blanding Boulevard and County Road 220. There will be lane closures from Monday through Friday during daytime hours only, between 9 a.m. and 4 p.m. No night work allowed on this project because of proximity to residences. There will be one lane open in each direction at all times during the day.
Columbia
Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.
State Road 238 Improvements
Work began in late January on a project to improve 15 miles of State Road 238 between U.S. 441 in Columbia County and State Road 231 in Union County, according to the Florida Department of Transportation (FDOT). The improvements include resurfacing the travel lanes and replacing the bridge railing on the Olustee Creek Bridge at the Columbia/Union County line.
U.S. 41/441 South of County Road 252
Traffic on U.S. 41/441 at the intersection with County 252 by Columbia High School will be temporarily halted while crews run new traffic signal cables across both roadways, according to the Florida Department of Transportation.
Dixie
Duval
Interstate 10/Interstate 95 Interchange Reconstruction
The I-10/I-95 Interchange from Stockton Street and the Fuller Warren Bridge to Adams Street is currently under construction. The project will not only increase the capacity of the Interchange but will also eliminate many of the current cross-lane weaving movements that drivers must negotiate as they use the current interchange. (2132431)
Interstate 10 from east of Halsema Road to Lane Avenue
A Florida Department of Transportation project to widen and improve 8.2 miles of I-10 from Lane Avenue to east of Halsema Road began in January 2009. The $58 million construction project involves widening I-10 from four to six lanes from I-295 to east of Halsema Road. Construction is scheduled to be complete in the spring of 2012.
Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.
Interstate 10 Master Plan East
A master plan for interstate Highway 10 (I-10) from east of I-295 at Lane Avenue to Stockton Street was completed in February 2009.
Alta Drive/New Berlin Road Resurfacing
Resurfacing and paving shoulders on Alta Drive from New Berlin Road to State Road 9A and on New Berlin Road from Zoo Parkway to Alta Drive (1.5 miles).
U.S. 301 Pavement Improvements
Improvements to U.S. 301 in western Duval County began in May and will continue throughout the summer as the pavement will be replaced to provide a smoother and safer ride, according to the Florida Department of Transportation.
Interstate 95 Master Plan
Interstate 95 (I-95) is the primary north-south limited-access highway on Floridas Atlantic coastline, providing linkage between numerous metropolitan areas including: Miami, Fort Lauderdale, West Palm Beach, and Jacksonville. Within northeast Florida, I-95 forms the north-south spine through St. Johns and Duval Counties.
Lafayette
Levy
Manatee Springs Bike Trail
Levy County residents who may want to get in shape this New Year will be able to benefit from a new bike lane to be built along State Road 320, according to Florida Department of Transportation (FDOT).
County Road 316 and County Road 323 Intersection Improvements
Work is scheduled to begin Monday, April 5 on a project to improve safety at the intersection of County Road 316/Northeast 30th Street and County Road 323/Northeast 200th Avenue in Williston, according to the Florida Department of Transportation (FDOT).
Madison
Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.
Nassau
Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.
Putnam
Mosley Avenue Improvements
The project, located between Edgemoor Street and U.S. 17, will resurface the road providing smoother pavement. The Florida Department of Transportation (FDOT) is overseeing this project which will also include curb and sidewalk improvements to meet current safety standards.
State Road 100 Rail Trail from Clay County line to C.R. 315
A new recreational opportunity will be available soon as work begins on the next section of the Palatka Lake Butler State Trail in Putnam County. The new 12-foot wide asphalt multi-use trail will extend nearly four miles along the former Norfolk-Southern Railroad corridor and mostly parallel State Road 100 on the north side of the road, between the Clay County line and County Road 315 in Grandin, according to the Florida Department of Transportation.
St. Johns
County Road 13 Bridge Replacement over Sixteen Mile Creek
The Florida Department of Transportation (FDOT) began a $3.4 million project to replace Sixteen Mile Creek Bridge on County Road 13 in St. Johns County Monday, January 4.
The bridge will be replaced with a new 40-foot wide concrete bridge with two 12-foot lanes and two 8-foot emergency lanes. Currently, the existing bridge, which was built in 1956, has a weight limit. Once the new bridge is constructed, the weight limit will be removed.
Crescent Beach Bridge Painting on State Road 206
A project to paint the Crescent Beach bridge on State Road 206 began in February and is scheduled to be completed by the end of 2010. Lane closures as well as detours using the State Road 312 bridge will be necessary at times during the project. Signs will be posted on State Road 206 for two weeks leading up to any total bridge closure and detour. The bridge can only be closed a total of 15 days during the 300 day project.
Pablo Road Bridge Replacement
Pablo Road is scheduled to be completely closed for approximately eight months beginning Tuesday, June 1 while the Florida Department of Transportation replaces the bridge over the Ponte Vedra canal.
Interstate 95 Master Plan
Interstate 95 (I-95) is the primary north-south limited-access highway on Floridas Atlantic coastline, providing linkage between numerous metropolitan areas including: Miami, Fort Lauderdale, West Palm Beach, and Jacksonville. Within northeast Florida, I-95 forms the north-south spine through St. Johns and Duval Counties.
State Road 206 Railroad Crossing Repairs
The railroad crossing on State Road (S.R.) 206, between I-95 and U.S. 1 in St. Johns County, is scheduled to be replaced and will close the road for four days starting next weekend, according to Florida Department of Transportation.
King Street Drainage
A Florida Department of Transportation project to improve drainage on King Street (S.R. 5A) will begin in September. Work includes replacing underground pipes and constructing a new backflow prevention system at the San Sebastian River.
Suwannee
Interstate 10 Master Plan West
The purpose of an Interstate Master Plan is to guide the development of a multi-modal interstate system that will serve the transportation needs of people, provide for the efficient and effective movement of freight, and foster economic growth and development in the region as well as the state as a whole.
Interstate 10 from U.S. 90 to U.S. 129
Approximately nine miles of Interstate 10 from U.S. 90 to U.S. 129 in Suwannee County is scheduled to be resurfaced in 2011 at an estimated cost of $16 million.
County Road 252 Resurface and Widening
Improvements to County Road 252 (Pinemount Road) in Suwannee County began Monday, January 4. This roadway project will require daytime lane closures and other impacts to residents and motorists who use this county roadway. The project, located between the Columbia County line and County Road 137, will resurface and widen the roadway three feet on each side to provide 12-foot travel lanes.
Taylor
Union