Traffic Alerts

Sort Alerts By: County | City | Road

Alachua

Archer Road (State Road 24) Roadway Lines
August 16 - August 22, 2008: Crews will be repainting the roadway lines between the Levy County line and Southwest 13th Street (U.S. 441).

Hawthorne Road (State Road 20) Routine Bridge Maintenance
August 16 - August 22, 2008: One lane will be closed at the U.S. 301 and CSX Railroad overpass Wednesday and Thursday from 8:30 a.m. to 4:30 p.m. for routine bridge maintenance.

Newberry Road (State Road 26) Roadway Lines
August 16 - August 22, 2008: Crews will be repainting the roadway lines between the Gilchrist County line and Gainesville.

Northwest and Southwest 13th Street (U.S. 441) Roadway Markings
August 16 - August 22, 2008: Daytime lane closures to allow inmate crews to repaint the roadway markings between the Marion County line and Northwest Sixth Street (State Road 20).

Southwest 13th Street (U.S. 441) Utility Work
August 16 - August 22, 2008: The southbound right lane between Southwest 12th and 14th avenues will be closed for utility work.

State Road 121 (NW 34th Street) Traffic Impacts
August 16 - August 22, 2008: Crews are working off the roadway during the day and shoulder or bike lane closures may be needed. Nighttime lane closures will be encountered as resurfacing work continues. Motorcyclists and bicyclists must use caution as a grooved roadway surface will be in place for up to two weeks before new asphalt is placed. Motorists should be aware of vehicles entering and leaving the roadway.

State Road 26A (SW 2nd Avenue) Traffic Impacts
August 16 - August 22, 2008: Intermittent daytime lane closures with flaggers directing traffic may be encountered from 9 a.m. to 4 p.m. as crews replace broken concrete near the edge of the road. Motorists should expect 10-15 minute delays.

US 441 from RR Overpass to I-75 Resurfacing Traffic Impacts
August 16 - August 22, 2008: No traffic impacts are expected. Project is complete.

Baker

County Roads 125 and 229 lane closures for Interstate 10 resurfacing
August 16 - August 22, 2008: Daytime and nighttime lane closures in the vicinity of Interstate 10 to mill and resurface the roadway.

Interstate 10 resurfacing between the Duval County line and U.S. 90 Traffic Impacts
August 16 - August 22, 2008: Starting Monday, rumble strips will be cut into the shoulders between State Road 121 (Exit 335) and U.S. 90 (Exit 324) which requires a lane closure but is a moving operation.

Interstate 10 Landscaping at the interchanges of State Road 121 and SR 228 Traffic Impacts
August 16 - August 22, 2008: No traffic impacts expected as the landscaping project is expected to be completed next week at the interchanges with State Road 121 and 228.

Interstate 10 Resurfacing in Baker/Nassau County Traffic Impacts
August 16 - August 22, 2008: Lane closings will occur at various times daily and nightly except from Friday at 6 a.m. to Sunday at 9 p.m. This project should be done in late summer or early fall of 2008.

U.S. 90 lane closures for Interstate 10 resurfacing
August 16 - August 22, 2008: Beginning Sunday night through Monday afternoon, the westbound lanes will be closed in the vicinity of Interstate 10 to mill and resurface. Traffic will be directed to the eastbound lanes.

Bradford

State Road 100 Rails to Trails Traffic Impacts
August 16 - August 22, 2008: State Road 100 side street traffic between the Bradford County line and the Putnam County line may be impacted periodically while the contractor completes miscellaneous items along the trail. Vehicular traffic is prohibited on the trail.

State Road 18 Traffic Impacts
August 16 - August 22, 2008: Daytime lane closures are scheduled between State Road 121 and the CSX Railroad in Brooker to mill and resurface the curves and for cleanup.

State Road 235 Traffic Impacts
August 16 - August 22, 2008: There are no lane closures scheduled for the week of August 18.

Clay

State Road 100 Rails to Trails Traffic Impacts
August 16 - August 22, 2008: State Road 100 side street traffic between the Bradford County line and the Putnam County line may be impacted periodically while the contractor completes miscellaneous items along the trail. Vehicular traffic is prohibited on the trail.

State Road 21 Multiuse Path in Keystone Heights Traffic Impacts
August 16 - August 22, 2008: Intermittent daytime lane closures may be encountered on State Road 21 Monday, August 18 through Friday, August 22 from the end of the sidewalk near Hardees Restaurant to Gold Head State Park while crews work on drainage modifications and the new pedestrian barrier wall at the Brooklyn Lake Bridge. This project should be completed by early 2009.

U.S. 17 near Denmark Drive Turn Lane Construction
August 16 - August 22, 2008: One northbound lane will be closed daily between 9 a.m. and 3 p.m. (Monday through Friday) through Friday, August 22 for constructing a turn lane.

U.S. 17/Doctors Inlet Bridge widening between Milwaukee Avenue and Creighton Road Traffic Impacts
August 16 - August 22, 2008: The new traffic signal at U.S. 17 and Creighton Road should be functional by Monday, August 18. Lane closings may occur within the project limits next week from Sunday through Friday. Lane closings are allowed northbound between 6:30 p.m. and 5 a.m. and southbound lane between 8 p.m. and 6 a.m. The projected completion time for this project is the winter of 2010.

Columbia

Interstate 10 Drainage Repairs in Suwannee County
August 16 - August 22, 2008: The outside northbound lane at the Suwannee County line is scheduled to be closed Monday from 8:30 a.m. to 4:30 p.m. to repair some washouts at the box culvert, weather pending.

Southwest Walter Avenue Road Closure Impacts
August 16 - August 22, 2008: The road is closed at the Rose Creek Bridge for bridge replacement. All traffic is detoured to Southwest Little Road for the next two months.

U.S. 90 West at Interstate 75 Routine Bridge Maintenance
August 16 - August 22, 2008: One lane will be closed in either direction under the Interstate 75 overpass Monday through Thursday from 8:30 p.m. to 5 a.m. for routine bridge maintenance.

U.S. 90 West Roadway Lines
August 16 - August 22, 2008: Crews will be painting the roadway lines on Sunday, August 24 from Interstate 75 to the Suwannee County line.

Duval

Blanding Boulevard Traffic Impacts
August 16 - August 22, 2008: Single lanes may be closed in both directions next week at various locations within the project limits between 9 a.m. and 2 p.m. and between 8 p.m. and 5:30 a.m. This project should be finished by early spring in 2009.

Branan Field Chaffee Road extension between 103rd Street and I-10 Traffic Impacts
August 16 - August 22, 2008: I-10 westbound WILL BE TOTALLY CLOSED within the project limits near Chaffee Road on Monday, August 18 from 8 p.m. to 6 a.m. Detour signs will be posted. The project should be completed in the fall of 2009.

Broward (DAMES POINT) Bridge Repainting Project
April 28, 2008 - April 28, 2009: One outside northbound lane on the (Broward) Dames Point Bridge has been closed and will remain closed for about a year. One southbound outside lane closed earlier will remain closed until the end of this year.

The lane closures are necessary for equipment and scaffolding needed to repaint the sides of the bridge.

The merge pattern for northbound traffic coming onto the bridge from Merrill Road and Southside Boulevard has also changed to allow for a safe placement of traffic information signs about the construction. The new traffic pattern provides a smoother transition for traffic to the bridge from the merge area because of the closed northbound lane. The new merge pattern is closer to Merrill Road and Southside Boulevard than than it was before so watch for this change as you travel in the area.

The bridge repainting project started on February 21, 2007 and should be completed by the spring of 2009.

Broward (Dames Point) Bridge repainting project Traffic Impacts
August 16 - August 22, 2008: About 2,600 feet of the right southbound lane near the peak of the bridge is closed until the end of 2008 for the bridge repainting project. About 2,600 feet of the right northbound lane is closed until the spring of 2009. This project should be finished in the summer of 2009.

Heckscher Drive over the Broward River Routine Bridge Maintenance
August 16 - August 22, 2008: Lanes will be closed in both directions on Tuesday, August 19 from 9 a.m. to 2 p.m. for routine bridge maintenance. Two-way traffic will be controlled using flaggers.

Interstate 10/Interstate 95 Interchange Traffic Impacts
August 16 - August 22, 2008: The ramp from I-95 northbound to I-10 westbound is scheduled to open to traffic around 8 a.m. on Saturday, August 16. I-95 northbound to 1-10 westbound WILL BE TOTALLY CLOSED on Tuesday, August 19 from 10 p.m. to 5 a.m. Detour signs will be posted. Lane closings may occur at various locations within the project limits on I-10 and I-95 between 10 p.m. and 5 a.m. Work and lane closings may occur on various side streets within the project limits. The estimated completion time for this project is 2011.

Interstate 295 over the Buckman Bridge Routine Bridge Maintenance
August 16 - August 22, 2008: One southbound lane will be closed on Tuesday, August 19 from 9:30 a.m. to 3:30 p.m. for routine bridge maintenance.

Interstate 95/ S.R. 9A east interchange reconstruction near JIA Traffic Impacts
August 16 - August 22, 2008: One southbound lane from Cole Road to the I-295/S.R. 9A interchange (about 4,000 feet long on the outside) is closed for ramp construction until approximately November 2008. The new ramp from I-95 south to S.R. 9A east should be finished in the fall of 2010.

J. Turner Butler Boulevard widening between Kernan Boulevard and San Pablo Road Traffic Impacts
August 16 - August 22, 2008: No lane closings are scheduled for next week. The anticipated project completion time is the winter of 2009.

Philips Highway (U.S. 1) near Bowden Road Utility Work
August 16 - August 22, 2008: One northbound lane will be closed daily (Monday through Friday) between 9 a.m. and 3:30 through Friday, August 22 for utility work.

S.R. 9A/Heckscher Drive interchange improvement project Traffic Impacts
August 16 - August 22, 2008: Lane closings will occur at various locations within the project limits next week on S.R. 9A, Heckscher Drive and New Berlin Road. Lane closings are allowed between 7 p.m. and 6 a.m. This project should be completed by the spring of 2009.

State Road 9A at J.T. Butler Boulevard Traffic Impacts
August 16 - August 22, 2008: J. Turner Butler Boulevard/S.R. 9A interchange construction Various ramp closings and directional closures will occur within the project limits on J. Turner Butler Boulevard and S.R. 9A from Sunday, August 17 through Friday, August 22 between 10 p.m. and 6 a.m. These closings and detours will not happen simultaneously. Only individual closings will occur on various nights. There are two long term detours in place. Both should be ended by October. S.R. 9A south to J. Turner Butler Boulevard east is being detoured to the Gate Parkway exit to S.R. 9A north to J. Turner Butler Boulevard east. J. Turner Butler Boulevard east to S.R. 9A north is being detoured to Kernan Boulevard to J. Turner Butler Boulevard west to S.R. 9A. This project should finish by the end of this year.

State Road 9A between Beach Blvd. and the UNF exit Routine Bridge Maintenance
August 16 - August 22, 2008: Various lanes will be closed nightly in both directions between 8:30 p.m. and 5 a.m. from Monday, August 18 through Thursday, August 21 for routine bridge maintenance.

State Road 9A just south of I-95 near the JIA Routine Bridge Maintenance
August 16 - August 22, 2008: Various lanes will be closed nightly in both directions between 8:30 p.m. and 5 a.m. on Wednesday, August 20 and Thursday, August 21 for routine bridge maintenance.

Wonderwood Expressway over the Intracoastal Waterway Routine Bridge Maintenance
August 16 - August 22, 2008: One eastbound lane will be closed on Thursday, August 21 from 9 a.m. to 2 p.m. for routine bridge maintenance.

Levy

State Road 24 Roadway Lines
August 16 - August 22, 2008: Crews will be repainting the roadway lines between U.S. 27 A (Alternate 27) and the Alachua County line.

U.S. 19 Resurfacing Traffic Impacts
August 16 - August 22, 2008: Daytime lane closures will be encountered as crews work on signals at the intersection of County Road 40 and US 19 and continue resurfacing operations. Please be aware of vehicles entering and leaving the roadway.

Nassau

Interstate 10 resurfacing between the Duval County line and U.S. 90 Traffic Impacts
August 16 - August 22, 2008: Starting Monday, rumble strips will be cut into the shoulders between State Road 121 (Exit 335) and U.S. 90 (Exit 324) which requires a lane closure but is a moving operation.

Interstate 10 Resurfacing in Baker/Nassau County Traffic Impacts
August 16 - August 22, 2008: Lane closings will occur at various times daily and nightly except from Friday at 6 a.m. to Sunday at 9 p.m. This project should be done in late summer or early fall of 2008.

Lem Turner Road (S.R. 115) Resurfacing from the Duval County line to U.S. 1 Traffic Impacts
August 16 - August 22, 2008: Lane closings will occur from Monday, August 18 through Friday, August 22 from 8:30 a.m. to 4:30 p.m. for resurfacing activities. Work may occur at various locations within the project limits from 7 a.m. to 5:30 p.m. on Saturday, August 16 and Saturday, August 23. This project should be finished by the end of this year or early 2009.

S.R. A1A/8th Street resurfacing from the Amelia River Bridge to Dade Street Traffic Impacts
August 16 - August 22, 2008: Lanes will be closed regularly in both directions at various locations within the project limits between 7 p.m. and 5:30 a.m. The work should end in early 2009.

Putnam

State Road 100 Rails to Trails Traffic Impacts
August 16 - August 22, 2008: State Road 100 side street traffic between the Bradford County line and the Putnam County line may be impacted periodically while the contractor completes miscellaneous items along the trail. Vehicular traffic is prohibited on the trail.

State Road 20 in Interlachen Traffic Impacts
August 16 - August 22, 2008: Traffic is expected to be shifted to the new roadway at the intersection of State Road 20 and County Road 315 in Interlachen Saturday, August 23. Motorists should expect daytime lane closures in this area as crews prepare for the shift. Please be aware of vehicles entering and leaving the roadway.

State Road 26 Resurfacing Traffic Impacts
August 16 - August 22, 2008: Daytime lane closures are scheduled on State Road 26 from State Road 21 to State Road 100 Monday, August 18 through Friday, August 22 from 8:30 a.m. to 4:30 p.m. while crews continue working on the roadway shoulder, guardrail and paving. Motorists should watch for flaggers directing traffic.

U.S. 17 Northbound at the Rice Creek Bridge Routine Bridge Maintenance
August 16 - August 22, 2008: U.S. 17 northbound at the Rice Creek Bridge, north of Palatka, is scheduled to be reduced to one lane with flaggers directing traffic Monday, August 18 from 9:30 a.m. to 4 p.m. for routine bridge maintenance.

St. Johns

Bridge of Lions (State Road A1A) Rehabilitation Traffic Impacts
August 16 - August 22, 2008: No lane closures or channel closures are anticipated at the Bridge of Lions Rehabilitation project for the week of August 18. For more information, please visit www.FDOTBridgeofLions.com.

State Road 16 from U.S. 1 to the Clay County line
August 16 - August 22, 2008: Daytime lane closures are scheduled on State Road 16 from U.S. 1 to the Clay County line Monday, August 18 through Thursday, August 21 while crews repaint the roadway symbols, such as turn lane arrows. One lane of traffic will remain open in both directions.

State Road 312 Cathodic Protection Traffic Impacts
August 16 - August 22, 2008: Eastbound State Road 312, on the bridge over the Matanzas River, is scheduled to be reduced to one lane Monday, August 18 through Friday, August 22 from 7:30 a.m. to 4:30 p.m. for a concrete pour. Boaters should also use caution while work is completed outside the main channel beneath the bridge, Saturday, August 16 through Friday, August 22.

State Road A1A from County Road 203 to the Duval County line
August 16 - August 22, 2008: Daytime lane closures are scheduled on State Road A1A from County Road 203 to the Duval County line Monday, August 18 through Thursday, August 21 while crews repaint the roadway symbols, such as turn lane arrows. One lane of traffic will remain open in both directions.

U.S. 1 at King Street Intersection Work Traffic Impacts
August 16 - August 22, 2008: Westbound King Street is closed to traffic near Broudys and a new detour is in effect. Motorists will be detoured south on U.S. 1 to State Road 207 to South Dixie/Pellicer Lane and back to King Street. This detour will be in place for approximately six weeks while the northwest corner of the intersection is under construction.
Daytime lane closures may also be encountered at the intersection of U.S. 1 and King Street Monday, August 18 through Friday, August 22 from 9 a.m. to 3:30 p.m. while crews work on the turn lanes. Please watch for merging traffic.
The eastbound detour on King Street will take place once westbound King Street traffic is restored, approximately six weeks from August 5. Stay tuned for weekly updates on when the eastbound detour will occur.

Suwannee

County Road 248 Resurfacing Traffic Impacts
August 16 - August 22, 2008: Daytime lane closures between U.S. 129 and State Road 247 to widen the roadway and to work on drainage pipes in preparation for resurfacing. The contractor plans to begin paving at the end of the week. The contractor is not working on Fridays.

Interstate 10 traffic detector installation
August 16 - August 22, 2008: One lane will be closed at the River Road overpass Monday through Thursday from 9 a.m. to 4 p.m. to install new traffic detectors in the pavement.

State Road 247 Resurfacing Traffic Impacts
August 16 - August 22, 2008: No traffic impacts scheduled as crews plan to begin work on drainage pipes north of the Branford to the Columbia County line. If any do occur, daytime lane closures will not begin until after 8:30 a.m. The contractor does not intend to work on Fridays.

U.S. 129 Resurfacing from Branford to McAlpin Traffic Impacts
August 16 - August 22, 2008: Daytime lane closures as resurfacing continues on the southbound lanes from McAlpin to the northern city limits of Branford. Also, crews are working on drainage pipes but no lane closures expected. Work is expected to begin in the city limits of Branford during the week of August 25. If entering the road from a driveway in the middle of a lane closure, make sure the traffic is headed in the same direction you wish to travel to avoid a head-on collision. The contractor plans to work Saturday.

Taylor

U.S. 19 Landscaping Traffic Impacts
August 16 - August 22, 2008: Motorists should expect single daytime lane closures for clearing of the medians and planting of palms during the next three weeks. Please be aware of vehicles entering and leaving the roadway.

U.S. 19 Roadway Lines
August 16 - August 22, 2008: Crews are repainting the roadway lines from north of Perry to the Madison County line.

U.S. 221 Roadway Lines
August 16 - August 22, 2008: Crews are repainting the roadway lines between U.S. 19 and the Madison County line.

U.S. 27 Resurfacing Traffic Impacts
August 16 - August 22, 2008: Motorists should expect daytime lane closures with flaggers directing traffic as crews work on the shoulders and resurface the roadway. When entering a lane closure from a side street, motorists should wait for traffic to clear in the direction they wish to travel before entering the roadway. Be aware of vehicles entering and leaving the roadway.

U.S. 27 Roadway Lines
August 16 - August 22, 2008: Crews are repainting the roadway lines between U.S. 19 and the Fenholloway River Bridge.

U.S. 98 Roadway Lines
August 16 - August 22, 2008: Crews are repainting the roadway lines between the Jefferson County line and U.S. 19.

Union

State Road 18 Traffic Impacts
August 16 - August 22, 2008: Daytime lane closures are scheduled between State Road 121 and the CSX Railroad in Brooker to mill and resurface the curves and for cleanup.